casinotoplisting.com

Hard Rock International Moves Forward With Three-Venue Entertainment Complex at Former Mirage Site

Jonas Patterson · Aug 17, 2026

Hard Rock International Moves Forward With Three-Venue Entertainment Complex at Former Mirage Site

Hard Rock Las Vegas redevelopment site showing Guitar Hotel tower plans

Hard Rock International is moving ahead with construction of three separate entertainment spaces as part of its transformation of the former Mirage property into the Hard Rock Las Vegas resort, and the project centers on a new Guitar Hotel tower that will anchor the entire development.

County filings and project documents outline a schedule that targets a late 2027 opening for the full resort, which means planning reviews must stay on track through the coming months.

Breakdown of the Three Planned Venues

The first venue is a brand-new 2,000-seat West Theater arena that will rise on the west side of the property through entirely new construction, while the second space converts the existing 5,000-seat Hard Rock Live theater into the primary home for major touring acts and extended residencies.

The third venue reuses the former Mirage Theater for smaller-scale productions that include comedy shows and specialty performances, creating an intimate room that rounds out the overall programming mix.

These three distinct spaces are designed to operate side by side, and each one addresses a different segment of the live-entertainment market that the resort hopes to capture once doors open in 2027.

Current Status of County Approvals

Clark County records show that the Paradise Town Advisory Board is scheduled to review the entertainment plans next, after which the full Clark County Commission will consider final approval, and this sequence keeps the project on pace for groundbreaking activities that align with the late-2027 target date.

Documents submitted to the county detail site layouts, seating capacities, and operational plans for each venue, while also addressing traffic flow, parking access, and integration with the larger Guitar Hotel tower structure.

Rendering of Hard Rock Live theater interior concept

Observers note that the upcoming advisory-board meeting represents a key checkpoint because any conditions added at that stage could shape final design elements before commission sign-off.

How the Venues Fit the Overall Resort Vision

The Guitar Hotel tower serves as the central landmark for the redeveloped site, and the three entertainment venues are positioned to draw guests both from the tower itself and from other Strip properties once operations begin.

Project filings indicate that the 5,000-seat Hard Rock Live space will handle the largest productions, the new 2,000-seat West Theater will support mid-sized events, and the repurposed Mirage Theater will focus on lower-capacity shows that require closer audience interaction.

County planning materials further describe shared backstage infrastructure and loading facilities that will support all three rooms without duplicating major mechanical systems.

Timeline Considerations Through 2026 and 2027

With the advisory-board review listed as the next formal step, project timelines point to continued design refinement through the remainder of the current year and into 2026, while construction phases are expected to accelerate once full commission approval is secured.

The late-2027 opening window remains the stated goal in all submitted documents, and that date accounts for the sequential nature of permitting, construction, and final inspections required for a multi-venue resort of this scale.

Conclusion

Hard Rock International's filings present a clear framework for three complementary entertainment venues that will anchor the redeveloped Mirage site, and the upcoming Paradise Town Advisory Board review marks the immediate next milestone before Clark County Commission consideration. The combination of a new 2,000-seat arena, the converted 5,000-seat Hard Rock Live theater, and the repurposed smaller Mirage Theater creates a layered programming approach that aligns with the resort's 2027 opening target.